How we plan a steel fixing package before mobilising
A walk-through of the pre-start review we run on every new package — drawings, bar list, sequence, ITP, access — and why it saves arguments later.
Get in touch →Short reads on steel fixing, sequencing reinforcement, and keeping a package moving on a busy site.
A walk-through of the pre-start review we run on every new package — drawings, bar list, sequence, ITP, access — and why it saves arguments later.
Get in touch →The reinforcement detail that quietly catches main contractors out the most often. What to watch for at pre-pour, and how we plan around it.
Get in touch →Cover, laps, spacing, restraint, congestion. The order we walk a section in, and what we expect to be signed off before the concrete gang arrives.
Get in touch →What we look for, what we pay, and why dependable attendance and trade pride still beat everything else on a long programme.