A specialist steel fixing subcontractor based in Bedford, placing reinforcement for Tier 1 contractors and their joint ventures on major rail, highways and water infrastructure.
Quick-Steel-Fixt Ltd is a Bedford-based subcontractor focused on one thing: getting reinforcement placed correctly, on programme, and signed off first time. We work for Tier 1 contractors and their joint ventures on major infrastructure — bringing CSCS-carded steel fixers and a clear method to each package.
Our crews have run continuously on national infrastructure for the past three years. Deep shafts, viaducts, overbridges, bridges and box structures, alongside framework schemes in the water industry and structures on the highway network.
The business was built around a simple idea. Steel fixing is a trade where details matter: cover, laps, spacing, congestion around couplers, tying patterns at restraints. The crews that get those details right save the main contractor time on the pre-pour inspection and money on rework. That's the standard we work to.
Before a single bar gets cut, we walk the package with you — sequencing, access, follow-on trades, ITP holds. Once we mobilise, we run the section ourselves: gang management, materials control, daily progress against the bar list, and quality checks before each pour window.
We take on full reinforcement packages on RC frames and infrastructure schemes — pilecaps and footings through to walls, columns, cores and suspended slabs. Labour-only enquiries welcome where the main contractor wants to keep the bar supply in-house.
Every gang is led by a chargehand with years on RC frames and infrastructure work. We don't put fixers on bars they aren't comfortable with, and we don't leave a section for someone else to chase down.
Send drawings and a programme. We'll come back with a sensible sequence and an honest price.
Get a quote